Project Overview

This is a modern two-storey office building for a Wastewater Treatment Plant in Mississauga, designed to meet current operational requirements while anticipating future growth. The design integrates advanced technology and innovative solutions, including a centralized building automation system, energy-efficient systems, and provisions for future connectivity through a below-ground tunnel. Distinctive architectural features such as a central elevator, open atrium and lobby, outdoor patio, and dedicated parking lot enhance functionality and user experience.

Three quarter bird's eye view of Clarkson Wastewater Treatment Plant Administration Building | Parking lot with 3 cars, modern rectanglular building with rows of windows on all sides, HVAC system on roof, water treatment pools behind the building

Related