Project Overview

Environmental sustainability cannot live in a silo. It is a fundamental consideration at every stage of a design process. When Waterfront Toronto engaged RVA to provide preliminary and detailed design engineering services for a new stormwater facility, we seized this opportunity to create a solution that would make for a more sustainable urban core.

This facility plays a huge role in one of Canada’s largest urban renewal projects; one already gaining visibility on the world stage. This $30 billion revitalization project spans 800 ha of former industrial land; include 6,000 residential units (as well as commercial use space); and serve as home to athletes attending the 2015 Pan American Games. Our designs help protect the surrounding lands from Don River flooding by contributing to a new, comprehensive stormwater management system built to redefine possibilities along this part of Toronto’s shoreline. We designed the structure to meet LEED Gold standards and include energy-efficient features. This included the architectural design, which featured a unique building shape and concrete finish. RVA factors environmental considerations to have lasting impact on cities like Toronto for generations to come.

RVA Architecture CSSMF Exterior
CSSMF Exterior 2
Stormwater Management Facility Aerial of Top of Building during Construction__2021
CSSMF Construction 2
CSSMF Construction 3
CSSMF Construction 4
Cherry Street Stormwater Management Facililty

Related