Project Overview
RVA was retained by Durham Region to assess, design, and tender a rehabilitation solution for a critical section of the Corbett Creek Trunk Sanitary Sewer (TSS) beneath the CN/Metrolinx railway tracks. The project began with a third-party technical review of the 1,375 mm diameter sanitary trunk sewer to evaluate the structural impacts and risks caused by additional loading from a newly constructed adjacent infrastructure project.
This project included reviewing historical records, third-party engineering reports, and a completed independent soil-structure interaction analysis to determine the potential impacts on the existing sewer and the associated long-term risks to the Region. The investigation confirmed structural distress, including joint seepage and loading impacts, and the need for structural rehabilitation of the deteriorated sewer segment.
While the project was shaped by significant constraints, including rail coordination, hydraulic capacity requirements, restricted access beneath the corridor, and the requirement to maintain uninterrupted service to support ongoing and future upstream development, multiple trenchless rehabilitation options were evaluated. RVA recommended the use of a new technology for the Region – Glass Reinforced Plastic (GRP) pipe installed by slip-lining method, which was adopted as the preferred solution.
In 2025, approximately 135 m of trunk sewer was successfully rehabilitated between two newly constructed access chambers using GRP slip-lining installed under live flow conditions in under one month. During the process, RVA’s environmental team supported field investigations and mitigation measures to protect sensitive vegetation and
endangered species within the Corbett Creek corridor. The completed works enhance the resilience of a critical underground infrastructure, while helping to ensure reliable wastewater services to the surrounding community.
Gallery