Welcome to R.V. Anderson Associates Limited   Click to listen highlighted text! Welcome to R.V. Anderson Associates Limited Powered By GSpeech
  • A  A  A  A  
Search

Maki Point Subdivision, Lake Nepahwin

Services, Urban Development Services

Maki Point Subdivision, Lake Nepahwin

Client: Masotti Developments Limited
Location: City of Greater Sudbury, Ontario

Project Status: The project was completed in the course of one season and was embraced by the building community. All lots were purchased and homes were constructed as the subdivision was completed. The subdivision is considered one of the most desirable addresses in the city.

Project Description:

R.V. Anderson Associates Limited was retained to design and provide contract administration for the construction of Maki Point Subdivision. Due to technical challenges related to the construction and infrastructure, the land remained vacant in spite of being a prime parcel within the city. Topography is extreme, with severe rock faces and approaches to the waterfront. Extensive and detailed grading with controlled excavations and fills made the lots attractive to the housing market. To provide fire protection, the existing small diameter watermain was connected to an existing trunk watermain some 150 metres offshore resting in 20 metres of water on the bed Lake Nepahwin.


More in this category:

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

Click to listen highlighted text! Powered By GSpeech