Welcome to R.V. Anderson Associates Limited   Click to listen highlighted text! Welcome to R.V. Anderson Associates Limited Powered By GSpeech
  • A  A  A  A  
Search

Appleby Line/Dundas Street Road Widening and Reconstruction

Services, Transportation Services

Appleby Line/Dundas Street Road Widening and Reconstruction

Client: Halton Region
Location: Burlington, Ontario

Project Status: The project was successfully completed in fall 2011 for $16-million.

Project Description:

This project includes the detailed design, contract preparation, and contract administration and inspection services for the widening of Appleby Line to a six-lane urban section for 1.5 km, from Taywood Drive to Highway 407 ETR, and the widening of Dundas Street for 0.5 km, from Sheldon Creek to the CN Rail grade separation, in Burlington. The intersection of Appleby Line and Dundas Street was reconstructed to provide dual-left turn-lanes in each direction.

This assignment included a watercourse relocation (N1 Branch of Sheldon Creek) as a natural channel design, bike lanes, a pedestrian bridge, concrete culverts, traffic signals and roadway illumination, enhanced landscaping design, property acquisition, utility relocations, coordination with local developers and approvals from Conservation Halton and DFO.


More in this category:

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

Click to listen highlighted text! Powered By GSpeech